Aggreko – GPA Temporary Power – Phase 1 & 2 (2016)

Project Type – Power Structures; Design; Inspection; Permitting; Construction Support

Project Description – TGE was contracted by Aggreko to provide Design, Permitting, and Construction Support services for the Aggreko temporary power facility adjacent to the Yigo Power Plant. Aggreko was, in turn, contracted with the Guam Power Authority(GPA) to provide them with power from the facility.This original intent of this Design-Build project was to construct a temporary power facility utilizing 39 portable, self-contained generators. The facility contains 10 20,000-liter fuel storage tanks, fuel pumps, a control station, transformer areas, and the aforementioned 1MW portable generators. In Phase 2, the original 1-year contract was extended for 4 additional years, rendering it necessary to retrofit the facility with an emissions upgrade, which TGE provided the same services for.