DPW Bile-Pigua Bridge Replacement Project (2017)

Project Type – Road and Bridge; Construction Management

Project Description – TG Engineers provided the full scope of Construction Management services to the Guam Department of Public Works(DPW) for the Bile and Pigua Bridge Replacement project in Merizo.This project was unique, with the project having been previously started and stopped with a separate contractor before TGE’s completion of the project. The bridges were constructed with an increased span to widen the existing river opening at the bridges, and included river embankment upgrades upstream and downstream. In addition, road approaches to the bridges were reconstructed and widened to include asphalt concrete pavement approach ramps, paved shoulders, and installation of warning and traffic regulatory signage to direct traffic through the limits of the project site.